# Cutover Runbook

Your day-of switching plan to ensure a smooth CRM migration.

## Roles and Responsibilities

### Migration Lead
- Overall coordination
- Go/no-go decision authority
- Stakeholder communication
- Issue escalation

### Data Specialist
- Execute exports and imports
- Validate data quality
- Handle deduplication
- Fix data issues

### Technical Lead
- API connections and integrations
- Troubleshoot technical issues
- Monitor system performance
- Execute rollback if needed

### Team Lead
- User communication
- Training coordination
- Collect feedback
- Document issues

---

## Timeline

### T-24 Hours: Pre-Migration
- [ ] Final backup of old CRM
- [ ] Notify all users of freeze window
- [ ] Confirm test import results
- [ ] Verify new CRM access for all users

### T-2 Hours: Preparation
- [ ] Send "freeze" notification to team
- [ ] Set old CRM to read-only (if possible)
- [ ] Clear new CRM test data
- [ ] Final system checks

### T-0: Migration Start (Freeze Window Begins)

#### Step 1: Final Export (30 minutes)
- [ ] Export contacts from old CRM
- [ ] Export companies/accounts
- [ ] Export deals/opportunities
- [ ] Export notes and activities
- [ ] Verify export file sizes and row counts
- [ ] Save raw files to backup location

#### Step 2: Data Preparation (45 minutes)
- [ ] Run deduplication scripts
- [ ] Apply field transformations
- [ ] Validate required fields
- [ ] Prepare import files
- [ ] Generate data quality report

#### Step 3: Import Execution (1-2 hours)
**Import Order (Critical):**
1. [ ] Companies/Accounts first
2. [ ] Contacts second (link to companies)
3. [ ] Deals/Opportunities third (link to contacts/companies)
4. [ ] Notes and activities last

**After each import:**
- [ ] Check import summary (success/failure counts)
- [ ] Spot-check 10 random records
- [ ] Verify relationship links
- [ ] Document any errors

#### Step 4: Validation (1 hour)
- [ ] Run validation checklist (see 06-Data-Validation-Checklist.xlsx)
- [ ] Test critical workflows
- [ ] Verify integrations working
- [ ] Check user access and permissions

### T+2 Hours: Go-Live Decision
- [ ] Review validation results
- [ ] Migration Lead makes go/no-go call
- [ ] If GO: notify team and open new CRM
- [ ] If NO-GO: execute rollback plan

---

## Validation Steps (Critical)

### Data Integrity Checks
1. Record counts match (within expected dedup range)
2. All required fields populated
3. Relationships intact (contacts → companies, deals → contacts)
4. Notes and activities linked correctly

### Functional Checks
1. Can create new contact
2. Can create new deal
3. Can send email from CRM
4. Can log activity
5. Search works correctly

### Integration Checks
1. Email sync working
2. Calendar sync working
3. Third-party integrations active
4. API connections verified

---

## Team Communication Template

### Pre-Migration Announcement (T-24h)
```
Subject: CRM Migration Tomorrow - Action Required

Team,

Tomorrow at [TIME] we're switching to [NEW CRM].

FREEZE WINDOW: [START TIME] to [END TIME]
- Do not create/edit records in [OLD CRM] during this time
- Do not make any deals or send proposals
- Check your email but don't log activities

We'll send updates every 30 minutes.

Access [NEW CRM] at: [URL]
Login credentials: [DETAILS]

Questions? Reply to this thread.

- [Migration Lead]
```

### Migration In Progress (Every 30min)
```
Migration Update [HH:MM]

✅ Exports complete
✅ Companies imported: [COUNT]
✅ Contacts imported: [COUNT]
⏳ In progress: Deals import

On track for [ESTIMATED COMPLETION].

Do not access [OLD CRM].
```

### Migration Complete
```
Subject: CRM Migration COMPLETE - You Can Log In

Team,

Migration is complete. You can now:
- Log into [NEW CRM] at [URL]
- Access all your contacts, deals, and notes
- Resume normal operations

IMPORTANT:
- [OLD CRM] is now READ-ONLY
- Use only [NEW CRM] going forward
- Report any issues in #crm-migration Slack channel

Quick Start Guide: [LINK]
Training session: [DATE/TIME]

Thank you for your patience.

- [Migration Lead]
```

---

## Rollback Plan

### When to Rollback
- More than 10% data loss
- Critical integration failures
- Widespread data corruption
- Validation checks fail

### Rollback Steps
1. [ ] Notify team immediately
2. [ ] Re-enable write access to old CRM
3. [ ] Document what went wrong
4. [ ] Schedule post-mortem meeting
5. [ ] Plan retry date

### Post-Rollback Communication
```
Subject: CRM Migration Postponed

Team,

We've paused the migration due to [REASON].

Action items:
- Resume using [OLD CRM] immediately
- All data is safe and intact
- We'll regroup and try again [NEW DATE]

Details on what happened and next steps: [LINK]

Thank you for understanding.

- [Migration Lead]
```

---

## Post-Migration (First 24 Hours)

### Immediate (0-4 hours)
- [ ] Monitor error logs
- [ ] Watch support channels
- [ ] Address urgent issues
- [ ] Collect initial feedback

### Day 1 (4-24 hours)
- [ ] Run full validation suite again
- [ ] Fix any discovered issues
- [ ] Update documentation
- [ ] Send day-1 survey to team

### Week 1
- [ ] Daily check-ins with team
- [ ] Monitor adoption metrics
- [ ] Fix edge cases
- [ ] Conduct hygiene audit (see Week-1 hygiene section)

---

## Emergency Contacts

**Migration Lead:** [NAME, PHONE, EMAIL]
**Technical Lead:** [NAME, PHONE, EMAIL]
**CRM Vendor Support:** [PHONE, EMAIL, TICKET URL]
**IT/DevOps On-Call:** [PHONE, EMAIL]

---

**Part of the CRM Switching Pack**
For more resources, visit [ralivi.com/tools/crm-switching-pack](https://www.ralivi.com/tools/crm-switching-pack)
